Paris Elementary School

Location:

Greenville County, SC
 

Architect:

McMillan Smith & Partners, PLLC, Spartanburg, SC
 

Contractor:

Melloul Blamey Construction Ltd., Greenville, SC
 

Construction Manager:

Institutional Resources, Greenville, SC
 

Project Scope

Sq. Footage:

Total: 81,471 sf; 36,900 sf of insulated precast wall panels
 

Levels/Floors:

2
 

Structural Precast Elements:

• Insulated precast sandwich wall panels
 
 
 
 
 
 
 
Paris Elementary School
Paris Elementary School
 
 
 
 
 
 
 
 
 
 
 
 
 

Removing classrooms and adapting spaces from an existing two-story prototypical design, Paris Elementary School was built on a tight site next to the original Paris school. An efficient floor plan provides flexibility and state of the art technology for 600 students. The exterior replicates the historical significance of a prior community landmark, using sophisticated pre-cast detailing such as intricate reveal patterns, multiple colors of cast-in thin brick, antique white cement with a sandblasted finish and an arched colonnade. Paris Elementary utilized a total of 36,900 SF of insulated precast wall panels. This school, located in Greenville, SC, was occupied in 2004.

Project Details:
• Two level design
• 81,471 sf
• 600 student core capacity
• Designed to PCI MNL-117 standards

Insulation:
• R-11 with carbon grid wythe

 
Back to